Thursday, October 30, 2008

Getting close to the sheet rock!










Today was an eventful day at 3155. The electricians and plumbers were heavy at work. The roof is mostly on and should be complete here in the next day or two. Once the electrician and plumber finish up then the HVAC guys will get what they need to do done the the city inspector will clear us to put up the dry wall. This all may take 3 to 5 days.

Sunday, October 26, 2008

We are almost ready for Sheet Rock!!!










We are making a couple quick changes on the inside and then we will be able to get the plumbers and electricians in to run all of their things through the freshly framed up home. The Exterior of this home is real appealing and I can't wait to see it with siding and a roof. Here are a few photo's!

Monday, October 20, 2008

The home is taking shape!









Wow! This home looks fantastic! the walls really show how nice a plan this home really is! Take a look at the pictures. The roof should be up and shingling should be taking place by weeks end.

Tuesday, October 14, 2008

Framing has begun!



The framers are working away. The rain on Monday delayed them a day but that isn't going to slow them down. Look for the shell to go up rather quickly. I would imagine that the framers will be done in a week or 2. Mark Behr (Builder) has a goal of the roof being on and done by November 1 to stay on time. Right now it looks good!

Friday, October 10, 2008

Plumbing After the Rain!


Not to be alarmed if there is a little water in the basement. It is common at this stage of construction. The water will all be pumped out and the gravel will be spread out to absorb any moisture in the ground before the floors are poured. The plumbing looks to all be in place and the cement floors should be poured on Saturday the 11th! Rock and Roll. Framing will start first of the week (weather permitting)!

Tuesday, October 7, 2008

Basement walls are in and Plumbing is beginning.




The plumbing lines will be roughed into the basement floor today and tomorrow. Look at the progress. This is a great lot! With the basement in it is easier to see the privacy of the back yard and how nice the setting will be. Once all the plumbing is in the basement floor will be poured shortly after that. Look for framing to start in the next week!!! Hold on tight cause things are beginning to get ramped up a notch!

Wednesday, October 1, 2008

Footings



The footings are poured and the basement walls will be set and poured over the next 2-3 days. This means we are moving right along. When the walls are poured and set the plumbing will begin. More updates to come!